Skip to main content

bridge replacement

Fargo Road bridge to be closed beginning August 14

By Press Release

Press Release:

The Fargo Road Bridge Replacement Project is set to commence on August 14, bringing essential improvements to the bridge located over Black Creek near Route 63 and Little Canada Extension.

The current 11-foot-wide jack arch bridge will be replaced with a modern 28-foot precast concrete arch bridge to meet hydraulic capacity requirements. This upgrade is crucial for maintaining smooth truck routes, as Fargo Road serves as a superload route within the County.

The project is locally funded, with Ravi Engineering in Rochester leading as the Engineer and LC Whitford as the Contractor. Construction is planned to continue diligently until the end of November.

Fargo Road will be closed during the construction period for the safety of motorists and construction workers. However, a well-marked detour will be in place to guide motorists and trucks efficiently.

Wortendyke to be closed for 'significant' bridge replacement beginning Monday

By Joanne Beck
Wortendyke culvert in Town of Batavia
Wortendyke Road, between South Main Street Road and State Route 33 in the Town of Batavia, will be closed during "a significant bridge replacement" project beginning Monday. 
Photo by Howard Owens.

A “significant bridge replacement project” to the tune of six figures is about to shut down a portion of Wortendyke Road for up to two months beginning Monday, Genesee County Highway officials say.

The project, funded by a grant agreement to accept $50,000 of county Soil and Water Conservation District grant funds matched by existing county funds, will replace Culvert 8G on Wortendyke Road in the Town of Batavia.

Classified as a large span culvert — metal culvert structures that span in excess of 40 feet — the project will require a temporary closure of approximately six to eight weeks between South Main Street Road and State Route 33, county officials said.

County Highway Superintendent Tim Hens had recently recommended that the county Legislature — via the Public Service and Ways & Means committees — execute the grant agreement and modify the capital project, making the appropriate budget amendment to allow for the matching funds.

The county Soil and Water Conservation District offered the grant to implement Best Management Practices with the installation of large-span culverts, and, per the resolution, “the grant agreement provides $50,000 to be matched by existing county funds allocated to the large-span culvert capital project."

Closure announced for Pratt Road bridge replacement

By Billie Owens
Public Notice

 

Effective Monday, May 20, the Genesee County Highway Department will close Pratt Road, between Killian Road and Indian Falls Road for the Pratt Road bridge replacement.

Detour signs will be posted. The road will be closed through mid-October.

Portion of Searls Road in Byron to close Wednesday for six months

By Billie Owens
From the Genesee County Highway Department:
 
The Genesee County Highway Department will be closing Searls Road in Byron, from North Byron Road to Tower Hill Road, effective Wednesday, Oct. 31, through May 1 for a bridge replacement. No thru traffic will be allowed. Detour signs will be posted.

Stroh Road bridge replacement project in Alexander to begin May 7 and last about six months

By Billie Owens

From County Highway Superintendent Timothy J. Hens:

The County has hired LC Whitford from Wellsville to replace the Stroh Road bridge over the Tonawanda Creek in the Town of Alexander.

The contractor plans on closing the bridge to traffic starting at approximately 7 a.m. on Monday, May 7th. The bridge will be closed for approximately six months while it is replaced.

There will be no detour posted during construction. Maplewood Road will remain open during construction.

Authentically Local